News and articles

Main groups of equipment

Implemented projects

  • Construction of 3-sell fan cooling tower FRPP 3500-3 with cooling capacity of 5000 m³/h on the territory of Steel Mill PJSC ZAPOROZHSTEEL under the project “Reconstruction of water circulating loop of scale-containing process effluents of rolling”

  • Construction of process pipelines and equipment of Cold Box Linde ASU at Steel Mill No. 2 (Pang Pet), the Republic of the Union of Myanmar

  • Construction of a system for storage, gasification and distribution of liquid argon, oxygen and carbon dioxide, construction of gas mixing station on the territory of the shipbuilding yard NIBULON Agricultural Limited Liability Company (Nikolaev, Ukraine), implementation of EPC project (on a turnkey basis).

  • Construction of flat bottom cryogenic storage tanks of LOX (1 400 m³) and LIN (750 m³), manufactured by Cryospain S.L. on demand of PJSC LINDE GAS UKRAINE as part of construction works of ASU Linde on the territory of PJSC АRCELOR MITTAL KRIVOI ROG.

about_1.jpg

Company services

  • ENGINEERING OF INDUSTRIAL CONSTRUCTION OBJECTS

  • EQUIPMENT, PARTS, COMPONENTS SELECTION AND SUPPLY

  • CONSTRUCTION AND INSTALLATION WORKS

  • COMMISSIONING WORKS

  • GUARANTEE SERVICES

  • POST GUARANTEE SERVICES

More information
2018 Cryo Inter Trading
All rights reserved