A turnkey project of the liquid nitrogen storage and distribution system construction was implemented at the LLC Service Oil, Poltava. Construction works were performed in three stages:
1. Development of design documentation.
2. Equipment supply:
- shipment of modular cryogenic pumping station of our own production on the basis of the cryogenic centrifugal pump GBS 155/4.5-5.5 C/3 made by CRYOSTAR S.A.S., France for liquid nitrogen pumping;
- shipment of a cryogenic tank of 80 m3 for storage of liquid nitrogen.
3. Installation and commissioning.