In August 2020, as part of the reconstruction project of the Poltava Regional Clinical Medical Cardiovascular Center of the Poltava Regional Council under the national program “Big Construction”, which was initiated by Volodymyr Zelensky, the construction of the liquid oxygen storage and gasification system was completed.
The constructed storage system consists of two cryogenic tanks manufactured by Auguste Cryogenics Slovakia s.r.o. (Slovakia) with a volume of 4800 liters and 3100 liters with an operating pressure of 18.5 bar, as well as two evaporators manufactured by CRYONORM BV (Netherlands).
The supplied cryogenic tanks with vaporizers are designed for centralized uninterrupted oxygen supply to consumers of this modern medical facility.
Installation works of cryogenic tanks and atmospheric vaporizers on an open site, pipelines, shut-off and safety valves, including quality control of welded joints, as well as commissioning works were carried out.
The purpose of this project is to ensure strengthening and preservation of public health, prevention of diseases, reduction of mortality from cardiovascular and cerebrovascular diseases, improvement of organization of cardiological care for patients and increase of efficiency of its application in complex treatment. The new cardiology dispensary will be able to provide assistance to more than 500,000 residents of the region suffering from cardiovascular diseases.