In 2013, our company executed the project: design, supply and installation of a fan cooling tower, model FRPP-2250-2 with the capacity of 45×10⁶ kcal/h at the customer's enterprise.
| SUBDIVISION | steelmaking |
| TYPE OF THE COOLING TOWER | counter flow evaporative fan cooling tower |
| HYDRAULIC LOAD | 3000 м3/h |
| HOT WATER TEMPERATURE | 45 oС |
| COLD WATER TEMPERATURE | 30 oС |
| WET-BULB TEMPERATURE | 19 oС |
| QUALITY OF WATER | conditionally pure water |
| COOLING TOWER FUNCTION | cooling of a steelmaking furnace closed circuit |
The design feature of this project is that in addition to the standard requirements for the cooling tower capacity and the quality of its components, the design and installation were carried out taking into account the constraint environment of the installation site, as well as the maximal usage of the cooling tower construction footprint - 200 m².
