By order of PJSC “Zaporizhstal” Integrated Iron & Steel Works, the design, delivery and installation of a three-cell fan cooling tower, model FRPP-3500-3 (with the capacity of 5000 m3/h) have been completed as part of the reconstruction of slag-containing effluents circulating loop of the water supply shop has been carried out at the Customer's premises.
