In October 2019, a turnkey project for the construction of a liquid nitrogen storage and distribution system was implemented at the Service Oil LLC, Poltava. Construction work was carried out in three stages:
1. Development of design documentation.
2. Equipment supply:
-
shipment of a modular cryogenic pumping station of our own production on the basis of the cryogenic centrifugal pump GBS 155/4.5-5.5 C/3produced by CRYOSTAR S.A.S., France for pumping liquid nitrogen. -
shipment of a cryogenic tank of 80 m3 for storage of liquid nitrogen.
3. Installation and commissioning.